Tag: railways and trains

Working towards carbon negative: Reducing supply chain emissions

Key takeaways:

  • Drax’s ambition of becoming a carbon negative company by 2030 means we’re always working to reduce our supply chain emissions further.
  • We’re partnering with different organisations to explore innovative solutions to lowering shipping emissions.
  • Through our experience of carbon capture and storage, we can deploy the technology to decarbonise operations at our pellet mills.
  • Using rail wagons specifically designed to transport biomass wood pellets helps us reduce transport on land emissions.
  • By developing a new BECCS power station in the U.S., we can help decarbonise electricity systems while removing emissions from the atmosphere and tackling climate change.

At Drax, we have ambitious plans to not only help countries around the world replace fossil fuels with renewable biomass, but to become a carbon negative company by 2030.

For the world to achieve its net zero targets and meet the Paris Agreement goals of keeping global temperature rises below 1.5°C, it’s essential to remove more carbon from the atmosphere than is produced.

Drax is leading in this effort through pioneering bioenergy with carbon capture and storage (BECCS) technology. BECCS is the process of generating renewable power using sustainably sourced biomass while capturing and permanently storing CO2.

Developing BECCS at scale and achieving our own carbon negative objective means working to decarbonise the technology’s entire supply chain. It’s a responsibility we’ve been committed to for decades, even before the Drax Power Station was converted to run on sustainable biomass, and we continue to look for new innovations.

Here are three of the ways we’re working to optimise our supply chains to make them as energy efficient and low-carbon as possible:

1. Shipping emissions: Harnessing the wind

Around 90% of the world’s goods are transported by sea, including the wood pellets produced at our pellet mills and used to generate renewable power at Drax Power Station in the U.K. And while shipping has a lower carbon footprint than road or air transport, the sector still accounts for around 3%, or 1 billion tonnes of global greenhouse gas (GHG) emissions. Initiatives to reduce the emissions associated with shipping are an important part of our efforts to decarbonise our supply chain and become carbon negative.

In 2022, we signed a memorandum of understanding with Japanese shipping company MOL Drybulk. Together, we’re exploring installing MOL’s proven Wind Challenger hard sail technology on vessels transporting wood pellets on routes such as British Columbia to biomass customers in Japan. Wind Challenger, which reduces fuel consumption and emissions by harnessing wind power through modern sails, could be ready to be fitted onto newly built vessels for Drax from 2025.

The Environmentally Friendly Bulk Carrier “EFBC” project’s use of new and more efficient wind-power could contribute to reducing emissions associated with shipping biomass by around 20%. At a later stage, the project could also incorporate the use of other low-carbon technologies, as well as lower-emission fuels such as liquefied natural gas, ammonia, and synthetic fuels.

We previously partnered with the Smart Green Shipping Alliance, dry bulk cargo transporter Ultrabulk, and Humphreys Yacht Design for a feasibility study that looked at reducing shipping emissions. The study examined the potential to retrofit an innovative sail solution known as FastRig onto Ultrabulk ships importing biomass into the UK. FastRigs, made from 100% recycled and recyclable material, are designed to considerably reduce GHG emissions and the use of fuel. The feasibility study found that the FastRig solution could help lower fuel use and GHG emissions on one of our export routes – from Baton Rouge, Louisiana, to Liverpool in the UK – by at least 20%.

2. Reducing emissions through carbon capture and storage

Biomass pellet plants are a key part of Drax’s supply chain. By producing renewable, sustainable biomass feedstock we can help countries around the world to replace fossil fuels.

Our pellet mills in Canada and the U.S. South use a mix of fibre sources – all of which are unsuitable for lumber or other solid wood products. Globally, in the first half of 2022, almost 70% of the fibre for our biomass came from sawmill residues, like sawdust and wood chips.

Fibre for biomass also comes from low-grade wood that’s rejected by the lumber industry, slash left over from lumber industry harvests, and trees removed in forest management processes, like thinning and wildfire mitigation.

The pelletisation process uses power from local grids – wedding us to regional power sources. In areas like the U.S. where 61% of electricity is still generated from fossil fuels, this adds to our Scope 2 emissions.

However, our pioneering development of carbon capture technology offers the potential to decarbonise emissions connected to pelletisation. It’s one of the ways that the experience and technology we put into action at a new U.S. BECCS plant can decarbonise other facilities, whole industrial clusters, and our own supply chains.

3. Rail: The low-carbon road option

For in-country transportation, Drax utilises rail freight as much as possible, as rail offers the capacity we need as well as having a lower carbon footprint than road transport. In the UK, we own 225 rail wagons, specifically designed to transport biomass wood pellets and will be taking delivery of 30 more in 2023. The bespoke wagons carry a greater volume of compressed wood pellets than traditional wagons are capable of, delivering around 20,000 tonnes of renewable biomass to Drax Power Station every day.

Train carrying sustainably sourced compressed wood pellets arriving at Drax Power Station in North Yorkshire

Train carrying sustainably sourced compressed wood pellets arriving at Drax Power Station in North Yorkshire [click to view/download]

Optimising the volume of biomass on each train allow us to run fewer trains to the power station, keeping emissions minimal. Using rail rather than road transport is estimated to save around 270,000 truck journeys and more than 32,000 tonnes of CO2 a year.

In 2020 a new rail link was opened to connect our LaSalle BioEnergy biomass pellet plant in Louisiana to the regional rail network, enabling the delivery of around 7,000 tonnes of biomass per week to the Port of Greater Baton Rouge. The rail link replaced the 27 tonnes that was previously transported by each individual truck.

Helping countries around the world achieve net zero and working towards becoming a carbon negative company is only possible if we continue our practice of examining our supply chain and developing new innovative ways to reduce emissions even further.

How sustainable biomass crosses the Atlantic to power the nation

In the UK, we’re so accustomed to using electricity we rarely think of the journey it takes from power station to plug.

In fact, electricity must travel across a network of cables, wires and substations before it makes it from the power stations generating it to the homes and businesses using it. At Drax Power Station, which supplies 16% of Great Britain’s renewable power, there’s another journey that takes place even before the electricity leaves the power station.

This journey – the journey of more than half of the compressed wood pellet fuel Drax uses to generate electricity – has its origins in the expanse of forestland in the southern USA.

From forest to fuel

The journey starts in the huge, working forests of the southern states of the USA where low value wood – such as the thinnings cleared as part of a forests’ growing cycle – is collected in a responsible and sustainable way to make high density wood pellets, which Drax Power Station uses to produce more than 60% of its electricity.

Drax Group’s own pellet manufacturer, Drax Biomass, produces around 15% of the power station’s renewable fuel. After pelletisation locally at its Amite and Morehouse facilities, located in Louisiana and Mississippi respectively, the biomass is transported to Drax Transit at the Port of Greater Baton Rouge, on the Mississippi River. From Morehouse, trains made up of closed-top grain cars, each capable of carrying 120 tonnes, transport the pellets 221 miles to Baton Rouge. At Amite, just 60 miles from Baton Rouge, fuel-efficient trucks carry 25-tonne loads between plant and port.

Once at the port, the truck and train cargoes are unloaded into one of two biomass storage domes – each holding 40,000 tonnes of biomass – before being loaded into the ships for their transatlantic journey.

A boat arrives at Peel Ports in Liverpool

From port to port

Drax uses a range of ships to carry the pellets on their 8,000-mile journey to the UK, ranging from big ‘Coastal’ ships, capable of hauling 20,000 tonnes, to truly massive Panamax ships, more than a quarter of a kilometre in length and capable of carrying up to 80,000 tonnes.

The ships leave the port and spend 24 hours travelling the 200 miles down the Mississippi River into the Gulf of Mexico, around Florida, and into the Atlantic. From here, it’s a 19-day voyage to reach ports in the UK. To put that into perspective, it took Columbus more than two months to make his first trip across the Atlantic.

The ships pull into ports in Tyne, Hull, Immingham and Liverpool, where they are unloaded. At the bespoke biomass port facility at Peel Ports in Liverpool an Archimedean screw removes the pellets from the ship’s holds and transports them onto a conveyer belt, which loads them onto trains. These four ports can process up to 12 million tonnes of biomass every year, combined.

From port to power station

Like the stateside journey, Drax uses trains to carry its cargo from port to power plant. The difference on the UK side, however, is that the UK trains were designed specifically to carry biomass wood pellets. Clever design and engineering was used to maximise the space inside each carriage and ensure the trains carry large loads despite UK rail restrictions.

These trains carry the pellets across the country (and even over the Pennines for trains coming from Liverpool) to Drax Power Station in Selby, North Yorkshire. Roughly 14 trains arrive at the plant every day and collectively unload about 20,000 tonnes of pellets every day, from Monday to Saturday. A system of conveyor belts carry these pellets to one of Drax’s four giant biomass storage domes, each capable of housing about 80,000 tonnes of pellets.

Then, when needed, the conveyor system takes the pellets on their final journey: into the furnace. The pellets are combusted, which boils water to create steam, which turns a turbine connected to a generator, which then feeds electricity to the national grid. The electricity travels across miles of cables, and wires, through substations and transformers, and finally into your power socket.

An engineer looking into a Drax furnace

Long journey, low emissions

Despite the number of miles travelled, the journey of biomass is tracked and managed to ensure the Drax Power Station supply chain is as low-carbon as possible. The result is that, even with all supply chain emissions considered, the power generated has a carbon emissions profile that is more than 80% lower than coal.

It might be one of the most impressive supply chains involved in powering this island – but it’s not the only one to travel thousands of miles. The journey of biomass to England joins liquefied natural gas (LNG) shipped from the Middle East, coal from Colombia and solar panels manufactured in China – imports that ensure we have readily available access to power on our shores.